Clients
Rio Tinto – seal construction at Jack Pot Mine
Arch – Mine Plans, Costs, Ventilation
Maple Carpenter Creek – Mine Plans, Prep Plant, Test Pit Permit
Yule Marble – Underground mine plan for dimensional stone
New Mexico Power Company – Analysis BHP San Juan Mine
Carpenter Creek – reserve Analysis, Overall Mine Plan, Select Test
Pit
BMP – Surveying, Mine Planning, Training, Safety, Permits, Plans,
MSHA
Consol – Mine Supt., Regional Underground Engineer, Director
Engineering, Chief
Engineer, Longwall Engineer, Section Forman, Maintenance Forman,
Laborer,
Trackman
Dravo – Vice President Dravo Coal Company
Dravo Lime Company – Works Manager at Maysville and Black River
division
Dravo Basic Materials – U/G Property Equipment/Operation
Martin Marietta – Review U/G operation
Carbon County Coal Company – General Manager, Mine Supt., Chief
Engineer
Chuitna – review quality analysis
City of Blanding – Blue Mountain Tunnel Repairs
Smoky River Coal – Longwall Supt.
Solvay – Longwall study – supply information to move Smoky River
Longwall to mine
Youngs Creek – waterline, overland conveyor design/estimate
Carpenter Creek load outs – temporary and permanent
Projects – Blasting – surface and underground, instructor at Belmont
Technical College, Longwall experience up to 15.5’ high and slopes
to 24 degrees, spontaneous combustion, methane gas, H2S gas
experience, kiln dust disposal – slurry and dry methods, limestone
fines disposal, hydraulic sand fill stopping’s/fill, Limestone U/G
openings 50’ wide and 75’ high, surface limestone with 120’ highwall
and benches, heavy media, jig, chance cone, flotation, hydrate plant
– bulk and bags, barge loading, unloading, truck loading/unloading,
unit train loading, bulk bags, paper bags – air table, conveyor
systems – 72” systems, underground and surface conveyor
transportation, calcining – long and preheater kilns, floating pump
stations on river, lading chute on river barge loading facilities,
prespliting benches U/G – 75’ high, 2 entry systems, no bleeder
system, etc.